lab
lab@amoovo.com
Amoovo Lab — yesterday, today, tomorrow
lab
Scroll
Yesterday
2024 — 2025
Yesterday
First immersion packs
Cells and electronics, fully submerged.
09 / 2024
Fluid circulation
Heat moves with the liquid, not the fan.
10 / 2024
Cerbo control
One system layer above BMS and inverters.
11 / 2024
Unlock logic
Half the capacity, held in reserve.
12 / 2024
32 kWh pack
Ready for the field.
02 / 2025
72 kWh core
The largest immersion core so far.
03 / 2025
Thermal stress
From frost to heat, on purpose.
05 / 2025
Built to scale
Engineered in Belgium.
12 / 2025
Today
2026
Today
LoopXCell LFK
Infrastructure, not a battery you replace.
2026
Climate series
GreyRock, GreenCore, BlueFrost, RedHot.
2026
CerebroXMesh
Open, auditable energy decisions.
2026
3D Lab
Drawn, printed, tested, drawn again.
2026
The crew
Four people, one workshop in Verviers.
2026
Marine
Salt, damp and vibration.
2026
Tomorrow
2027 →
Tomorrow
Structured systems
Core design, frozen and repeatable.
Phase 2
ELIA grid
Homes as distributed reserve.
2028
Scalable architectures
From lab to infrastructure.
Phase 3
Aerospace
Still in the lab.
Exploring
Yesterday
Today
Tomorrow